Our Blog

    • svg
      Posted on 12 January 2023 By huseyin.akar In Genel

      WordPress’e hoş geldiniz. Bu sizin ilk yazınız. Bu yazıyı düzenleyin ya da silin. Sonra yazmaya başlayın!

    • svg
      Posted on 3 May 2018 By huseyin.akar In Upgrade

      VINCI Construction acquires the Seymour Whyte Company and boosts its construction operations in Australia Acquisition of 100% of Seymour Whyte’s shares 2017 revenue of A$433 million VINCI Construction expansion in the Pacific area On 23 October 2017, VINCI Construction finalised the acquisition of the Seymour Whyte company based in Queensland.

    • svg
      Posted on 7 April 2018 By huseyin.akar In Spiecag

      Spiecapag, a VINCI Construction susidiary, wins a contract to build an oil pipeline for the Trans Mountain Expansion Project (TMEP) in Canada The project will be carried out in a joint venture with Canadian company Macro Enterprise Inc. Construction of an 85-km oil pipeline in British Columbia Trans Mountain Pipeline

    • svg
      Posted on 7 April 2018 By huseyin.akar In Proton , Therapy

      Proton therapy: IBA and VINCI Construction sign a global construction collaboration IBA, the world’s leading provider of proton therapy solutions for the treatment of cancer, and VINCI Construction, a global player in building construction, today announce the signing of a memorandum of understanding (MoU), effective immediately, to collaborate in offering

    • svg
      Posted on 7 April 2018 By huseyin.akar In Tower

      Warbud (VINCI Construction International Network) signed a contract with HB Reavis Construction PL for the structure, in reinforced concrete, of the Varso Tower, in the centre of Warsaw (Poland). This 110.000 sq. metre building, designed by architects Foster + Partners, will be the tallest in the European Union, with 50

    • svg
      Posted on 7 April 2018 By huseyin.akar In Motorway

      VINCI Construction subsidiary HEB Construction, has been chosen as part of an alliance contract1 to build the Northern Corridor Improvements Project (NCI Project). With a total value of $700 million New- Zealand dollars (around €415 million), the contract aims at creating a new connection north of Auckland between the Northern

    • svg
      Posted on 6 April 2018 By huseyin.akar In Metro , Planning

      VINCI and HOCHTIEF, in a joint venture, have been awarded the design and build contract for Sydhavn Metro Line (Line 4) in Copenhagen. The client Metroselskabet has awarded the contract to an equal-parts joint venture consisting of VINCI Construction Grands Projets and HOCHTIEF Infrastructure. HOCHTIEF will be the technical leader

    • svg
      Posted on 6 April 2018 By huseyin.akar In Planning

      This concerns the renovation of the Chamkar Mon water treatment plant, valued at some €21 million. Teams have been working since September on the demolition of the existing plant, prior to the design-build phase for the new plant which will see the production of drinking water there increase from 20,000

    • svg
      Posted on 4 April 2018 By huseyin.akar In Uncategorized

      Welcome to WordPress. This is your first post. Edit or delete it, then start writing!

    • svg
      Posted on 30 March 2018 By huseyin.akar In MOU

      Collaboration to build more high skilled talent in Greater Kuala Lumpur The University of Malaya, Malaysia’s No.1 ranked higher education institution and VINCI Construction, a leading design and build construction company and a major global player in the construction sector, entered into a Memorandum of Understanding (MoU) to jointly work